Rustoleum Chalk Painted Vanity Update Project
TaKenya Hampton
How I updated my vanity cabinets in two of my three bathrooms in my home, using Rustoleum Chalk Paint, Rustoleum Aged Glazed. And in case you care I am including what I think about it now that it is all said and done.
Prep Time 35 minutes mins
Active Time 1 hour hr 30 minutes mins
Drying Time 4 days d
Total Time 4 days d 2 hours hrs 5 minutes mins
[Drill]
Tape
Foam brush
Narrow paintbrush
Wide paintbrush
Paint roller
Dropcloth
Clean surface.
Tape around walls and surfaces you do not want to be painted.
Remove doors and any hardware.
Paint allowing 30-60 minutes drying time between coats until you get the desired coverage.
Allow 3-4 days of drying time for the paint to cure.
Apply glaze using a foam brush and wipe away with a clean cotton cloth.
Allow 24 hours drying time.
Top with protective topcoat.
Filed In bathroom makeover, chalk paint, glazed paint, rustoleum, vanity update
Let me know know what questions you have or how it turns out!